Katoen Natie rooftop solar, 4.1MWp, Jurong Island
Energetix · 28 years in solar PV

One view of every rooftop, ground-mount and floating array under watch.

165 MWp
Installed capacity
650+
Installations completed
200+
Sites under monitoring
Katoen Natie, Jurong Island — 4.1 MWp

Public figures from Energetix's own materials. The numbers below are what's actually being tracked live in this platform.

Sites needing attention 0

Recent field notes 0

Portfolio map

All 58 real Energetix sites, plotted by stated location. Marker size reflects capacity; positions are approximate to the named area, not surveyed GPS.

Industrial
Commercial
Community
Ground-mounted
Residential

Flagship projects 0

Projects with photography on Energetix's own site.

Full project directory 0

From Energetix's corporate brochure — real capacity and location, ready to start tracking.

← All sites

Performance ratio trend

Reading log

DatePR %Output (kWh)Notes

Field notes for this site

Cross-site degradation comparison

Select sites with at least one reading. Ranking uses the PR change between each site's first and most recent reading — real data only.

PR trend overlay

Select two or more sites Choose sites above with logged readings to overlay their performance trends.

Degradation ranking — fastest declining first

Lessons learned 0

Shared across every engineer using this platform — searchable by site and category.

Energy Calculators

Singapore-standard figures used throughout. All results are indicative — contact Energetix for a full site assessment.

☀️ Solar Savings Calculator

Estimate system size, energy output and financial return
Recommended system size
Annual energy generation
Annual electricity savings
Estimated payback period
25-year return on investment
Assumes 1,400 peak sun hours/year (Singapore average), 80% performance ratio, SGD 1,500/kWp indicative installation cost. Actual results depend on site assessment.

🌿 Carbon Reduction Calculator

Quantify your environmental impact and ESG contribution
Annual energy generated
Annual CO₂ avoided
Equivalent trees planted
Equivalent cars removed
Cumulative CO₂ over selected period
Uses Singapore grid emission factor of 0.4057 kg CO₂/kWh (EMA published figure). Tree equivalence: 21 kg CO₂/tree/year. Car equivalence: 4.6 tonnes CO₂/car/year.

AI Energy Advisor

Ask anything about solar, battery storage, ESG, ROI, or Singapore energy regulations — powered by Energetix's 28 years of expertise.

Hi, I'm the Energetix AI Energy Advisor. I can answer questions about solar PV, battery storage, microgrids, ESG compliance, financial returns, and Singapore energy regulations. How can I help you today?

Suggested questions

What's the typical ROI for a commercial solar installation in Singapore?
How does a Power Purchase Agreement (PPA) work?
What size solar system do I need for a 5,000m² warehouse?
How much CO₂ would a 500kWp system save per year?
What certifications should I look for in a solar installer?
How does battery storage reduce peak demand charges?
What government incentives are available for solar in Singapore?
How long does a commercial solar installation typically take?
This advisor provides general guidance based on Energetix's expertise. For a detailed site assessment and formal proposal, please contact an Energetix consultant directly.